Studio · Approach

How a project moves.

Five stages. Named steps, realistic durations, no hidden handoffs. Every project we deliver follows this shape — adapted in scale to programme.

01

Brief

We meet to understand the programme, site, budget range, and completion target. Discussion, not a form. Output: a written scope summary emailed back to you within 48 hours.

Duration
Week 1
02

Design

Concept design, material palette, 3D renders, shop drawings. Revisions to approval. If you have an appointed consultant, we work under their drawings with the same rigour.

Duration
Weeks 2–5
03

Approval & procurement

Authority approvals where applicable, procurement of materials and finishes, joinery shop-drawing sign-off, long-lead item ordering.

Duration
Weeks 6–8
04

Site works

Demolition, first fix (MEP), ceiling and partition works, floor works, joinery installation, marble and stone, decorative works, final fix, snagging.

Duration
Weeks 9–20+
05

Handover

Client walk-through, snag rectification, cleaning, commissioning, as-built drawings, warranty documentation. Keys handed over.

Duration
Final 2 weeks